Sharing knowhow in offshore wind construction

Report from Gwynt y Môr

By Steen Drue, Project Manager, A2SEA A/S

Turbine installation work at Gwynt y Môr began on April 30 when SEA JACK started work loading components for the very first of 160 turbine locations. Seven weeks later, SEA WORKER departed from Grenaa, Denmark, headed for the port of Mostyn to join the installation teamwork. In June, the two vessels began working ”side-by-side”, although, in reality, they only occasionally pass each other on the water. Continue reading

Teamwork can be tough

By Tony Millward, Senior Project Manager, A2SEA A/S

Complex geotechnics, a tight, seven-month winter project, and a client whose programme called for multiple, simultaneous vessel operations. With demands like these, the Anholt project needed as much as it could get of that magic ingredient: teamwork. And its steep learning curves meant, however, that the A2SEA team was under plenty of pressure. Continue reading

Customers talk about challenges

With offshore wind developments in the UK currently generating more power than the rest of Europe combined, and a strong pipeline of projects planned for the coming decade, offshore wind has become a major element in the UK energy mix.

In the Irish Sea, home to two of the Round 3 zones, locating a harbour with enough storage capacity to stock huge turbines and foundations, and deep enough for large installation vessels to operate, were two major challenges facing both DONG Energy and RWE. Continue reading