By Hans Peter Johannsen, Vice President, Projects.
This is the first post in a series about reducing the LCoE in the offshore wind industry through optimising turbine loading, transport and installation.
In offshore wind, few things dominate industry conversations as much as reducing the levelised cost of energy (LCoE). And certainly, with many years spent working to optimise equipment, procedures and safety, turbine installation contractors such as A2SEA have been able to become highly efficient, bringing the costs of installation down within the installer’s scope of control. In a series of articles, we’ll be discussing the steps we’re taking to achieve even greater efficiencies. Continue reading