By Hans Peter Johannsen, Vice President, Projects.
This is the second article in our series about reducing the LCoE in the offshore wind industry through optimising turbine loading, transport and installation.
These days, A2SEA is as busy as ever, working through a pipeline of turbine installation projects that shows no sign of slowing down. Such healthy demand is a blessing, of course, but we’re equally lucky in that the purpose-built vessels SEA CHALLENGER and SEA INSTALLER were initially designed to handle not just the installation of turbines, but foundations as well. Why is that so lucky? It’s all about how much they can handle.